Friday, October 26, 2012

Reconstruction Day 24

Thursday MCC continued work on installing interior wall panels in the house and began installing the interior wall panels in the garage.  Preparations began for the installation of the garage door, which will be mounted on a track attached to the garage ceiling.

Some of the interior walls and cabinets installed

The first interior wall panel installed in the garage

The garage door awaiting installation

The tracks for the garage door waiting to be put in place

1 comment:

  1. for a more sexy look, you can expose one side of the 455 stainless bars and make a small partition for the cabinet or small closet. Finish it with a primer and your choice of paint color.

    ReplyDelete