Saturday, October 13, 2012

Reconstruction Day 17

Friday MCC installed the rest of the roof insulation, along with the remaining wood sleepers, which had not all been put in place the first time to leave space for the insulation.

The sewer line has been fully installed and the trench filled in.  Once the bathroom appliances are installed the house will have a functioning toilet.  This is an important landmark for getting the house open at the end of construction.

The electrical rough-in was finished, which included additional wiring in the ceiling, the bracing for three ceiling fans, and wiring for two ceiling lights.

MCC will return on Monday to continue work on the house.