Wednesday, October 10, 2012

Reconstruction Day 14

MCC returned to campus Tuesday to continue work on the house.  they painted the ceilings, and did work on the trellis to prepare it for installation.  In preparation for installing the interior panels, they have also begun to install a wooden nailer along the bottom of the panels that have been put up so far.  The nailer is a thin strip of wood that will fill the gap between the base of the interior and exterior panels.

Preparations are also being made for the concrete at the entrance to the garage to be re-poured.  The concrete outside the front door and in the ramp up to the garage is cracked and will have to be removed and re-poured.