Last week MCC continued to install insulation and interior wall panels, most of which are now in place.  They have also added most of the panels that form the walls between the rooms along with the cabinets for each room.

The portion of the foundation that was dug up for the plumbing fixes in the bathroom has been re-poured with all the pipes installed.

The cabinets and walls installed in one of the rooms

The second bedroom with some of the walls and cabinets intsalled

The replaced portion of the bathroom floor


The main room with yellow cabinets and some walls installed