Tuesday, October 16, 2012

Reconstruction Day 18

Monday MCC returned to campus to continue work on the interior of the Steel House.  They began installing insulation inside the walls, as well as putting some of the interior panels in place.  Several of the yellow interior panels that form the walls of the house's main room have been installed.

P&H also poured the concrete in front of the garage.  The original step by the front door is still in place, and the new concrete slopes up to match the edge of the original garage floor.  They also poured footings for the trellis, which MCC will install over the front door and garage opening.

The newly poured concrete

one of the concrete footings for the trellis

Concrete footings outside the front door

The new sewage line recently installed and the trench filled in