Thursday, September 27, 2012

Reconstruction Day 13

MCC left to return to Philadelphia after a half day or work today, but before they finished for the week, they installed the back doors and covered the entire house with protective tarps to keep rain off the unfinished roof.  Next week MCC will remain in Philadelphia to continue work on the interior panels, which still need to be painted.  They will return to campus the week of October 8th.  In the mean time, the roofing will be installed and other work will continue on the restoration.

The back double doors, installed this morning

All the windows and doors in place

The inside of the front door

The future site of the bathroom, with some of the wiring and interior panels installed

The back doors from the outside, and the house covered by the protective tarps for the weekend until the roofing is watertight 

Insulation for the roof awaiting installation

Wednesday, September 26, 2012

Reconstruction Day 12

Today the last of the windows was installed.  The front door was also put in place, and the door jamb for the back double doors was fitted.  The back doors are not installed yet, but will be tomorrow.  The electrician also continued work on the wiring, including the data cables, which is almost complete.

Fitting one of the final windows


Installing the doorjamb for the rear double doors

The front door, installed by MCC today

Reconstruction Day 11

The electrician returned and put in most of the wiring today.  MCC continued to install windows, most of which are in place.  They also put up a few of the interior wall panels and some of the cabinets in the smaller bedroom.  With some of the interior walls in place you can really start to see where the rooms will be and imagine what it will be like when it's finished!

Two interior wall panels installed and some cabinets

The electrical wires installed so far

Windows put in place so far

Monday, September 24, 2012

Reconstruction Day 10

Today the electrician for the project began the wiring.  He will be coming back hopefully to complete it tomorrow.  Once the electrical wiring is done MCC can finish the roofing.  In the mean time, the MCC crew is installing windows.  They have put in several of the windows already and will continue working on them tomorrow.

The completed shell with some of the windows installed

The interior of the garage

Looking through where the front door will soon be

Installing some of the windows

One window installed, one awaiting installation

The beginning of the wiring installed by the electrician today

Sunday, September 23, 2012

Reconstruction Day 9

On Friday MCC installed the wood blocking and sleepers for the garage roof.  They also finished the roof sheathing and covered it with a protective tarp for the the weekend.  the next step is installing the inner-wall wiring, which will be followed by roof insulation, fascia panels and roofing.

Installing the garage roof wood blocking and sleepers

Garage roof sheathing finished

Tarps covering the unfinished roof awaiting wiring, insulation, and roofing material

Thursday, September 20, 2012

Reconstruction Day 8

The garage assembly was finished today.  The last of the roof panels were put in place, finishing the reassembly of the exterior structural panels.  Several of the windows were also installed.

Putting one of the windows in place

The last roof panel being lifted into place

Installing the last panel and tightening bolts

Wednesday, September 19, 2012

Reconstruction Day 7

The garage walls were put up today.  The first few roof panels for the garage were also put in place.  The roof was not entirely finished, but once it is, all the exterior panels will be up. One of the windows, the one in the bathroom wall, was also installed today.  Work on the house will continue for the rest of the week--they're making great progress!

The newly reconstructed garage

Working on the roof panels for the garage

The first window to be installed

The future bathroom, with the window in place

A stack of windows waiting to be installed