P&H also poured the concrete in front of the garage. The original step by the front door is still in place, and the new concrete slopes up to match the edge of the original garage floor. They also poured footings for the trellis, which MCC will install over the front door and garage opening.
The newly poured concrete
one of the concrete footings for the trellis
Concrete footings outside the front door
The new sewage line recently installed and the trench filled in
No comments:
Post a Comment