Today the last of the windows was installed. The front door was also put in place, and the door jamb for the back double doors was fitted. The back doors are not installed yet, but will be tomorrow. The electrician also continued work on the wiring, including the data cables, which is almost complete.
Fitting one of the final windows
Installing the doorjamb for the rear double doors
The front door, installed by MCC today
These are wonderful and inspirational, thank you for posting them
ReplyDeletePatio Sliding Glass Door Replacement
Windows And Doors Phoenix