MCC left to return to Philadelphia after a half day or work today, but before they finished for the week, they installed the back doors and covered the entire house with protective tarps to keep rain off the unfinished roof. Next week MCC will remain in Philadelphia to continue work on the interior panels, which still need to be painted. They will return to campus the week of October 8th. In the mean time, the roofing will be installed and other work will continue on the restoration.
The back double doors, installed this morning
All the windows and doors in place
The inside of the front door
The future site of the bathroom, with some of the wiring and interior panels installed
The back doors from the outside, and the house covered by the protective tarps for the weekend until the roofing is watertight
Insulation for the roof awaiting installation