Wednesday, September 12, 2012

Reconstruction Day 2

Work onsite continued today as planned.  No more problems have been found with the reassembly process, although having to resize the holes in all of the panels is slowing down the reconstruction somewhat.  Despite this setback, the exterior front wall as well as five panels of each of the side walls were back in place by the end of today.  The roofing panels are also being put back in place as the side walls are put up.  This will help make the frame more sturdy and keep the wall panels in place.  MCC will return to campus tomorrow to continue work.

The partially reconstructed side wall with two window openings towards the front

A view inside--the wooden divisions between each of the panels are thermal spacers to prevent the steel  panels from touching one another.  These will not be visible once the interior walls are in place.

The first completed wall facing onto Mohegan Avenue with one of the partial side walls


The MCC crew hard at work reinstalling the exterior wall panels


One of the roof panels waiting to be put back in place

No comments:

Post a Comment