Thursday, July 12, 2012
Steel House Progress
There's been more progress made on the Rusty's restoration! Unfortunately we're still behind schedule, but Rusty is getting closer to completion. The existing doors have been restored and reassembled along with window sashes, frames, trim pieces, and interior wooden cabinets which have been repaired, repainted, and reassembled. The brass hardware components have also been stripped of paint and polished. Work has also been completed on the garage: the existing roof railing components have been repaired, and three mesh panels have been manufactured to replace original ones. The fireplace components have also been restored, and, along with the garage components, have been blasted and coated with a high-performance (Tmenec system) epoxy primer and urethan topcoat.