MCC has sent another progress report. So far the window frames and cabinets have been repaired as necessary and primed. The rust inhibitor coating has been removed from almost all the steel pieces. The deteriorated ceiling panels, which are not being saved, have been removed from the steel channel frames, which will be saved and restored. Finally, work has been begun on recreating the garage door. The garage door components have been sorted out and measured in preparation replicating the original door.
No comments:
Post a Comment