Friday, September 23, 2011

Day Nine

We’ve made it to the end of week two! Rusty isn’t completely disassembled, but most of the back of the house has been taken apart, packed up and sent back to Philadelphia. In addition, the interior wall panels in the bedrooms (the two rooms at the front of the house) have been removed along with all the insulation packed inside the walls. Loosening Rusty’s rusty fasteners has sometimes been slow going. That, combined with the bad weather over the last few days has put them a little behind schedule. Because they didn’t completely finish disassembly, as was the original plan, Milner + Carr Conservation will be back sometime next week to take down the rest of the house. The workers that were here this week left to return to Philadelphia this afternoon, taking with them a truck full of house parts.